Pavement restoration project starts in Baxter Springs
The contractor will replace pavement on U.S. 69A/K-66 (Military Avenue) from 20th to 23rd streets.
What do you think?

A project has begun that will replace the pavement in Baxter Springs on U.S. 69A/K-66, according to the Kansas Department of Transportation.
During the project, the contractor will replace pavement on U.S. 69A/K-66 (Military Avenue) from 20th to 23rd streets. The curb, gutter, storm sewer and sidewalks on this stretch will also be replaced.
Signs, cones and other traffic control measures will guide motorists through the work zone on Military Avenue. The highway has three lanes, one of them is a center turn lane. One lane of the highway will be replaced at a time, allowing two-lane traffic to flow around the work zone.
Side road access within the work zone will be limited based on which side of the street is being reconstructed.
Work should be completed in March 2027, conditions permitting.
Heck and Wicker Inc., of Parsons, has the $1.9 million contract. This is a federal and state funded project from the City Connecting Links Improvement Program.
KDOT urges motorists to stay alert, follow posted signs and refrain from hand-held mobile device use in all active work zones. For current road conditions, visit kandrive.gov or call 511. For updates on construction projects in southeast Kansas, visit ksdot.gov/projects/southeast-kansas-projects.